PalEEpat-lEEpat yarn?
The department was initially housed at the Engineering Science Building B. It was moved later to the Instrumentation Building’s current location. On Oct 19, 1998, the department was once again relocated to the Powerhouse, now known as the Industrial Engineering Building. Finally, it was transferred to its permanent location in 2003, where the department is housed until the present. | Kim Jay R. Rosano, Annie Liza C. Pintor, and Roderick L. Catriz, 08 September 2021